MZ-Southern Africa Regional Gas Project
Sector: Road • Location: Mozambique
Source: World Bank
The objective of the Southern Africa Regional Gas Project between Mozambique and South Africa is to initiate the development and export of Mozambique's substantial natural gas resources in an environmentally sustainable manner, thereby contributing towards economic growth and poverty reduction. The Project consists of two distinct but integrated components. The Upstream Component concerns gas fi
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Oil and Gas, Natural Gas, Metal, Commercial, Steel, Government
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about MZ-Southern Africa Regional Gas Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Southern Africa Regional Gas Project between Mozambique and South Africa is to initiate the development and export of Mozambique's substantial natural gas resources in an environmentally sustainable manner, thereby contributing towards economic growth and poverty reduction. The Project consists of two distinct but integrated components. The Upstream Component concerns gas fields development in Mozambique's Inhambane Province. It will develop the gas fields and the associated processing facilities, making use of the five previously drilled appraisal wells and develop the Temane gas reservoir first as it has higher pressure than the Pande reservoir. The Central Processing Facility (CPF), part of the upstream component, will be constructed at Temane, and consists of gathering networks linking the wells, drying, compression, and condensate removal facilities. The Gas Pipeline Component consists of an 865-km 26-inches diameter high pressure steel pipeline between the gas fields and Sasol's petrochemical complex at Secunda in South Africa which will be buried at a minimum of one meter below the ground surface. The pipeline design includes five take-off points in Mozambique (at Ressano Garcia/Maputo, Magude, Macarratane, Chigub/ Funhalouro and Temane) to provide for possible domestic use of gas. The Project also includes associated infrastructure, such as roads, utilities, workshops, accommodation units and offices. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Mozambique |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Oil and Gas, Natural Gas, Metal, Commercial, Steel, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mozambique
- Maputo Port
- MOZAL S.A.R.L.
- Corredor de Desenvolvimento do Norte
- Mozambique - Supplementary Loan to Montepuez - Lichinga Road Project
- BEIRA CORRIDOR PROJECT
- Mozambique LNG Park, Cabo Delgaro Province
- Mozambique - The Pemba-Lichinga Integrated Development Corridor Special Agro-Industrial Processing Zone (SAPZ) Project -Phase I
- Mozambique - Massingir Dam and Smallholder Agriculture Rehabilitation Project
