MZA
Cancelled · Russia
Source: European Bank for Reconstruction and Development (EBRD)
A loan of ECU 13.4 million to finance the construction of a plant to recycle electronic scrap and to recover its precious metal content. The plant will be located in Kaluga, 180 km west of Moscow. This project has been cancelled. The project is an attempt by the Russian Government and the Ministry of Defence to entrust the realisation of assets to a private commercial venture backed by internation
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Water Supply and Storage, Government, Commercial, Residential
- Location
- Russia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about MZA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A loan of ECU 13.4 million to finance the construction of a plant to recycle electronic scrap and to recover its precious metal content. The plant will be located in Kaluga, 180 km west of Moscow. This project has been cancelled. The project is an attempt by the Russian Government and the Ministry of Defence to entrust the realisation of assets to a private commercial venture backed by international investors. The Russian Government has elected to let the private sector come up with, and compete for, its own technological and commercial solutions. The success of this venture will set a high-profile precedent to be duplicated in other circumstances. Metallurgicheski Zavod Ametist is a newly formed company. Its main shareholder is Ametist AOOT, which was a leading military company producing electronic components for hardware used in guiding systems. The plant will be built by Valme Industries SA, a French company specialising in this sector. International investment funds will provide around 30 per cent of the equity financing. The EBRD will provide a US$ 17.1 million (ECU 13.4 million) loan, of which US$ 6.4 million (ECU 5.2 million) will be syndicated to commercial banks. US$ 32.2 million (ECU 25.7 million). The project involves the conversion of a former military site into an electronic scrap recycling facility. The project has environmental objectives as it contributes to the reduction and processing of waste material requiring final disposal. The project was screened as B/1, requiring environmental auditing of existing facilities located in Kaluga and an environmental analysis to identify environmental or health and safety issues associated with the proposed development and to review the adequacy of the proposed mitigation measures. The main environmental issues identified encompassed regulatory compliance of the existing facility and of the proposed development with Russian and European Union requirements, responsibility for existing liabilities at the military site, waste-water treatment and discharge, air emissions and waste management. Based on the findings of environmental investigations, a preliminary Environmental Action Plan (EAP) has been prepared. The EAP includes the adoption by the company of an environmental management system, a programme for investigation and monitoring of sub-surface soil and water quality, and provisions for air emissions, liquid effluents and waste management. As part of the agreement with the EBRD, the company will be required to finalise and implement the EAP to ensure the company's compliance with applicable regulatory requirements in Russia and in the European Union. The company will also be required to report annually to the Bank on environmental, health and safety matters, including the implementation of the EAP. None |
Original sector | Natural Resources |
Location
Country | Russia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Metal, Water Supply and Storage, Government, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Russia
- Saratov Oil Refinery Expansion
- Development of tourist recreational potential and water tourism in Svetly and Malbork towns (Phase II)
- Application of eco-friendly solutions for solid waste management at municipal institutions.
- Clean Green City by Smart Waste Management
- Disruptive Information Technologies for Barents Euro-Arctic Region
- Preparation of investment into water quality improvement facility in Goldap-Gusev cross-border region
- Cross-border Routes
- Welfare from Sustainable Cross Border Nature and Culture Tourism
