N 148th Street Non-Motorized Bridge: Phase 2
Sector: Water Supply and Storage • Location: Seattle, Washington, United States of America
Source: Dodge USA
pedestrian bridge facilities including, but not 49 limited to bridge substructure elements, bridge superstructure elements, retaining walls, trail 50 facilities, pedestrian railing, electrical, lighting, drainage, sign structures.
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Power Generation (CCGT), Rail, Government, Commercial
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about N 148th Street Non-Motorized Bridge: Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | pedestrian bridge facilities including, but not 49 limited to bridge substructure elements, bridge superstructure elements, retaining walls, trail 50 facilities, pedestrian railing, electrical, lighting, drainage, sign structures. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Power Generation (CCGT), Rail, Government, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
