N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
Sector: Car parking • Location: Atlanta, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed study would address reconstruction of the north side of N. Central Avenue/US 41/SR 3, from Dearborn Plaza to I-75, and Porsche Avenue, from Sherman Road to I-75. Improvements include reconstruction/widened sidewalks and curbs/, handicap access improvements, bus stop access improvements, and aesthetic improvements such as landscaping and pedestrian level lighting. The study will refin
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed study would address reconstruction of the north side of N. Central Avenue/US 41/SR 3, from Dearborn Plaza to I-75, and Porsche Avenue, from Sherman Road to I-75. Improvements include reconstruction/widened sidewalks and curbs/, handicap access improvements, bus stop access improvements, and aesthetic improvements such as landscaping and pedestrian level lighting. The study will refine the scope, identify costs and constraints, and prepare a concept report. Including: 1) Preparing preliminary plans; 2) Preparing an itemized cost estimate; 3) Identification of environmental constraints and preparation of preliminary environmental studies; 4) Public outreach; 5) Identification of anticipated ROW/easement , including parcel count, and development of a GDOT preliminary right-of-way cost form; 6) Identification of utilities and preparation of a preliminary utility cost estimate; 7) Traffic and accident data analysis; and, 8) Approval of a concept report. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
