N Surrey Avenue Water Tower Improvements
Sector: Water Supply and Storage • Location: Ventnor City, New Jersey, United States of America
Source: Dodge
The work for each part of the tank is as follows: SSPC-SP10 Near White Metal Blast for the entire Interior wet. The Interior Dry of the tank should be cleaned using SSPC-SP10 near white metal cleanliness . For the Exterior full SSPC-SP6 Commercial Blast , with Class Full Rigid 2A Containment. After the repairs and recoating have been completed, the existing guide rail system will be reinstalled on
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Rail, Waste Processing and Treatment, Metal, Steel, Government
- Location
- Ventnor City, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about N Surrey Avenue Water Tower Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for each part of the tank is as follows: SSPC-SP10 Near White Metal Blast for the entire Interior wet. The Interior Dry of the tank should be cleaned using SSPC-SP10 near white metal cleanliness . For the Exterior full SSPC-SP6 Commercial Blast , with Class Full Rigid 2A Containment. After the repairs and recoating have been completed, the existing guide rail system will be reinstalled on top of the Elevated Steel Hydropillar Tank Water Storage Tank. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Ventnor City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Rail, Waste Processing and Treatment, Metal, Steel, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
