N Water Street Mixed-Use Development
Planning schematics · Missouri · Last reported Oct 2024
Source: Dodge USA
Proposed construction of a new mixed-use building at 1-11 N Water St with underground secured parking for residents with 25 parking stalls. First floor will have 10,090 sf commercial space with 1,600 sf patio, second and third floors will have 16 apartment units: 8 one bed and 8 two bed average 1,171 sf. Exterior materials include, SF-1 storefront Kawneer dark bronze, break metal balcony Firestone
- Status
- Prospective
- Sector
- Metal, Car parking, Road, Steel, Consumer Products, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Manufacturing (Industrial), Commercial
- Location
- Liberty, Missouri, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about N Water Street Mixed-Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Proposed construction of a new mixed-use building at 1-11 N Water St with underground secured parking for residents with 25 parking stalls. First floor will have 10,090 sf commercial space with 1,600 sf patio, second and third floors will have 16 apartment units: 8 one bed and 8 two bed average 1,171 sf. Exterior materials include, SF-1 storefront Kawneer dark bronze, break metal balcony Firestone or equal dark bronze, steel garage door overhead door model 424 (PTM match SF-1), fabric awning ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Liberty |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Car parking, Road, Steel, Consumer Products, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
