logo
ProjectClosed

N16 House / gruta.arquitetos

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

The third solution came as a result of the client's request for a spacious office to accommodate their professional and academic activities. This request came during the 2021 pandemic, prompting a design revision. The proposal was to locate the office on an upper floor to provide a view of the landscape and ensure separation from the social activities on the ground floor.The design solution with a

Status
Closed
Sector
Education, Cement, Car parking, Residential, Commercial, Automotive
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about N16 House / gruta.arquitetos

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “N16 House / gruta.arquitetos” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The third solution came as a result of the client's request for a spacious office to accommodate their professional and academic activities. This request came during the 2021 pandemic, prompting a design revision. The proposal was to locate the office on an upper floor to provide a view of the landscape and ensure separation from the social activities on the ground floor.The design solution with a higher purpose was to consolidate the program's compartments along a longitudinal axis on the right side of the lot and open up the social area to the unused portion on the left side, taking advantage of the corner condition, which allowed for no adjacent buildings on that side.With the choice of sober finishes, House N16 impartially accommodates the objects that tell the story of a couple who travels the world.In the final stages of the project, the fourth solution focused on the overall aesthetics. The volumetry was conceived to present two facades to the surroundings. A primary solid volume rests against the garage wall. After accommodating this volume, we sculpted the office, creating a wooden gallery with east and west views, along with a concrete block with a lower height for terrace landscaping and reduced ceiling height compared to the living area.The second design solution involved positioning the kitchen and barbecue area adjacent to the social areas by placing them on a transversal axis in the rear part of the lot."The lot is flat, with an area of 447m² at a corner." This is how the land was presented in the first meeting we had with the couple who owns it. A young couple with no children approached our office with a demand for a larger house and a generous relaxation area. The requested program included a private area with 3 suites and contiguous social and leisure areas, all on one floor.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Education, Cement, Car parking, Residential, Commercial, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project