Nachtigal
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The Nachtigal-amont project is a greenfield 420 MW run-of-river hydropower project located on the Sanaga river near Yaoundé, Cameroon (the "Project”, "Nachtigal") and developed as an Independent Power Producer ("IPP"). As of April 2017, the plant is estimated to achieve full commercial operations by 2022. This would make it the first IPP to be built on the Sanaga river benefiting from the upstrea
- Status
- Prospective
- Sector
- Raw Materials, Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Government, Power Transmission, Commercial
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Nachtigal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Nachtigal-amont project is a greenfield 420 MW run-of-river hydropower project located on the Sanaga river near Yaoundé, Cameroon (the "Project”, "Nachtigal") and developed as an Independent Power Producer ("IPP"). As of April 2017, the plant is estimated to achieve full commercial operations by 2022. This would make it the first IPP to be built on the Sanaga river benefiting from the upstream Lom Pangar regulating dam. The Project benefits from the full support of the Republic of Cameroon who just signed and granted the 35-year concession to the project company.The Project is the number one priority identified under the National Electricity Least Cost Development Plan ("NEDP") prepared in 2014 by the Ministry of Energy with the support of the World Bank. |
Original sector | V-BA - Large Hydro - Renewable Energy Generation |
Procurement method | |
Budget |
Location
Country | Cameroon |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Government, Power Transmission, Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Cameroon
- Expansion project for production of Palm Oil and Fruit Jams
- Cameroon - Lom-Pangar Hydroelectric Project
- Mise en place d'un projet de production de produits à base de banane plantain
- SUPPORTING VALUE CHAINS THROUGH INCLUSIVE POLICIES, INVESTMENT PROMOTION AND ALLIANCES (CASSAVA).
- Industrial Transformation of Root and Tuber Crops (RTC) Into Flour and Starch
- Complexe industriel intégré de la transformation du bois de Lomié (CIBLO)
- Cameroon - Agricultural Value Chain Development Project
- SBM-BANANES
