Nacmine Forcemain Replacement
Sector: Water Supply and Storage • Location: Drumheller, Alberta, Canada
Source: Dodge USA
The main items of Work of this Contract include the following: Installation of 1,600 m of 200 mm DR11 Sanitary Forcemain by Pipe Bursting. Installation of 600 m of 200 mm DR11 Sanitary Forcemain by Directional Drilling Installation of 320 m of 200 mm DR11 Sanitary Forcemain by Open Cut. The Site of the Work of this Contract is located in Drumheller, Alberta.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Drumheller, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Nacmine Forcemain Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main items of Work of this Contract include the following: Installation of 1,600 m of 200 mm DR11 Sanitary Forcemain by Pipe Bursting. Installation of 600 m of 200 mm DR11 Sanitary Forcemain by Directional Drilling Installation of 320 m of 200 mm DR11 Sanitary Forcemain by Open Cut. The Site of the Work of this Contract is located in Drumheller, Alberta. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Drumheller |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
