logo

Nagpur Kondhali Highway Project

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In December 2005, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Balaji Tollways Limited (BTL) for the upgrade, operation and maintenance of the 40.8 km stretch on National Highway six (NH-6), between Nagpur and Kondhali, in the state of Maharashtra. Under the agreement, BTL was required to design, finance and widen the existing two lane Nagpur-Kondhali sect

Project Information FAQ

Project Information

4 Q
The project “Nagpur Kondhali Highway Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2005, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Balaji Tollways Limited (BTL) for the upgrade, operation and maintenance of the 40.8 km stretch on National Highway six (NH-6), between Nagpur and Kondhali, in the state of Maharashtra. Under the agreement, BTL was required to design, finance and widen the existing two lane Nagpur-Kondhali section of NH-6 to a four lane dual carriageway. The concession term included the construction period of 30 months. BTL was a joint venture between India’s Atlanta Limited (74%) and SREI Infrastructure Finance Limited (24%). BTL won the concession in an international competitive tender, conducted by NHAI, by bidding the lowest subsidy of US$ 12.6 million. India’s highway development policy allowed ‘viability funding’ by NHAI to the tune of 40 percent of the capital costs as grant to the concessionaire, subject to competitive bidding. The total capital cost of the project was estimated at US$ 50 million. The project reached financial closure in August 2006. The project was financed by a combination of equity (US$ 12.8 million), debt (US$ 24.53 million) and NHAI grant (US$ 12.6 million). The debt component was raised from India Infrastructure Finance Company Limited (US$ 9.9 million), SREI Infrastructure Finance Limited (US$ 3.3 million) and Union Bank of India (US$ 8.8 million). BTL was to be compensated for the capital and operating costs from the NHAI grant and the tolls collected during the concession term. BTL was to receive half of the NHAI grant (US$ 6.3 million) during the construction period and the balance was spread out during the remaining concession term. The toll collection commenced after the construction was completed and was for a period of 17.5 years. Construction work on the project began in August 2006 and was expected to be completed by March 2009. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data