Nagsaag-Santiago 500 kV Transmission Line Project
Sector: Power Generation (CCGT) • Location: Philippines
Source: Bilyonaryo Business News
A transmission line project by NGCP involving the construction of a 500 kV transmission line between Nagsaag and Santiago. It is part of NGCP's Group 3 capital expenditure program for 2020 to 2025 and beyond.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- Bilyonaryo Business News
ConstructChat
Ask ConstructChat about Nagsaag-Santiago 500 kV Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A transmission line project by NGCP involving the construction of a 500 kV transmission line between Nagsaag and Santiago. It is part of NGCP's Group 3 capital expenditure program for 2020 to 2025 and beyond. |
Original sector | Power |
Budget |
Location
Country | Philippines |
Source
Source | Bilyonaryo Business News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
