Nahid Harbour
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Dodge USA
Phase 1 is a mixed-use building, up to 35 storeys high, with 720 apartments and approximately 469 square metres (5,049 square feet) of commercial space on the ground floor. Phase 2 is a second mixed-use building, up to 30 storeys high, with 690 apartments and approximately 569 square metres (6,129 square feet) of ground floor commercial space
- Status
- Prospective
- Sector
- Seaport, Commercial, Residential, Manufacturing (Industrial)
- Location
- Toronto, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Nahid Harbour
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1 is a mixed-use building, up to 35 storeys high, with 720 apartments and approximately 469 square metres (5,049 square feet) of commercial space on the ground floor. Phase 2 is a second mixed-use building, up to 30 storeys high, with 690 apartments and approximately 569 square metres (6,129 square feet) of ground floor commercial space |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Seaport, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in Canada
- Canada Post Pacific Processing Centre
- Maritime Helicopter Support Facilities - 12 Wing Shearwater
- Residue Storage Areas and Dams
- Long Harbour Processing Plant Site
- Winnipeg Art Galley
- Renforcement du réseau de transport à 315 kV de l’Abitibi‑Témiscamingue
- Modernisation du complexe de Beauharnois‑Les Cèdres
- Marine Use Strategy
