NAIA Expressway

Sector: Airport • Location: Philippines

Source: Road Traffic Technology

Project
Closed

The NAIA expressway phase two was commissioned in June 2017. Credit: RioHondo. The NAIA expressway phase two features a 2.22km-long at-grade feeder road. Credit: RioHondo. The NAIA expressway phase two was built by San Miguel Corp. Credit: RioHondo. The NAIA Expressway phase two links the Metro Manila Skyway to NAIA Terminals 1, 2 and 3. Phase two of the Ninoy Aquino International Airport (NAIA) e

Project Information FAQ

Project Information

4 Q
The project “NAIA Expressway” is an infrastructure initiative in the Airport sector, located in Philippines. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The NAIA expressway phase two was commissioned in June 2017. Credit: RioHondo. The NAIA expressway phase two features a 2.22km-long at-grade feeder road. Credit: RioHondo. The NAIA expressway phase two was built by San Miguel Corp. Credit: RioHondo. The NAIA Expressway phase two links the Metro Manila Skyway to NAIA Terminals 1, 2 and 3. Phase two of the Ninoy Aquino International Airport (NAIA) expressway running through Pasay and Parañaque in Metro Manila, Philippines, became fully operational in June 2017. The 12.65km toll road connects the Metro Manila Skyway to Terminals 1, 2 and 3 to provide improved access to the airport. It also interfaces with the Manila-Cavite toll Expressway (Cavitex), the South Luzon Expressway (SLEx), Macapagal Boulevard, and Sales Road. The NAIA Expressway phase two was implemented by the Department of Public Works and Highways (DPWH) through a public-private partnership. The NAIA Expressway project has been developed in two phases. Phase one was started in 2003 and completed in 2010. It is a 0.6km-long fully elevated expressway that starts at the Metro Manila Skyway and ends at Sales Road near NAIA Terminal 3. The first phase also includes entry and exit ramps beside the Resorts World complex. The NAIA Expressway phase two starts at the endpoint of phase one and ends at Pagcor Entertainment City in Pasay City. It comprises the main viaduct, ramps and at-grade road. The phase two development included two sub-phases namely Phase II-A and Phase II-B. Phase II-A connects Macapagal Boulevard to NAIA Terminals 1 and 2 while Phase II-B links Domestic Airport Road, Andrews Avenue and Sales Road. The viaduct is a 4.6km-long, four-lane, elevated expressway that starts from Sales Road near NAIA Terminal 3 and runs through Roxas Boulevard and Diosdado Macapagal Boulevard. It is built over NAIA Road, Sales Road, Domestic Airport Road, and Andrews Avenue. A total of 13 entry and exit ramps and three connecting ramps with a length of 7.95km are built along various locations, including NAIA Terminal 3, Cavitex, Villamor Airbase, NAIA Road, Seaside Drive, Imelda Avenue, Resorts World and Diosdado Macapagal Boulevard. Phase two also includes a 2.22km at-grade feeder road built across Andrews Avenue, Parañaque River, Diosdado Macapagal Boulevard, Sales Avenue, and NAIA Road. The grade feeder road leads the traffic to/from the Entertainment City. The Philippines’ independent economic development and planning agency National Economic and Development Authority (NEDA) approved the NAIA expressway phase two project in May 2012. The bid submission was held in April 2013. San Miguel Corp (SMC), through its subsidiary Vertex Tollways Development, won a 30-year contract with a concession offer of PHP11bn ($250m) from DPWH in July 2013, to design, build, finance, operate and maintain the NAIA expressway. The deal also allows SMC to collect tolls for a period of 30 years. D.M. Consunji, in collaboration with Design Science and Pertconsult International, was appointed to oversee the civil works for the NAIA airport toll road. The detailed engineering design phase of the project was carried out during August 2013 and April 2014 while construction was commenced in 2015. The elevated expressway, linking Macapagal Boulevard to Terminals 1 and 2 of NAIA, was opened in September 2016. The first access ramp of the project between Terminal 3 at Andrews Avenue and Skyway was inaugurated in November 2016. A road link connecting Pagcor Entertainment City, NAIA road, SLEx and Skyway was commissioned in December 2016. The access ramps 11 and 12 in the Cavitex area were also opened in the same month. Phase II of the NAIA toll road project was completed at a cost of PHP20.45bn ($410.9m). The Philippine Amusement and Gaming Corp provided PHP6.5bn ($130.62m). The project’s right-of-way acquisition cost of PHP2.25bn ($44.21m) was funded by the Philippine Government. The NAIA Expressway phase two is estimated to cater to up to 80,000 travellers a day and reduce traffic congestion on roads around the NAIA Terminals. It will also provide better access to the Entertainment City. It is expected to reduce travel time between the South Luzon Expressway (SLEx) and NAIA airport from 60min to 20min and that between Entertainment City and NAIA Terminals 1 and 2 from 25min to 8min. The airport toll road is also expected to bring economic benefits to Cavite Province.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data