logo

NAIROBI WATER SUPPLY

Sector: Water Supply and Storage • Location: Kenya

Source: World Bank Group

Project
Closed

The First Nairobi Water Supply Project, which is expected to increase the capacity of the Nairobi water supply system by 10 million imperial gallons per day, comprises the following: (a) the construction of an intake and ancillary works on the Chania River; (b) the provision and installation of a raw water pumping station; (c) a water treatment plant; (d) a 24-mile long transmission main to Nairob

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Kenya
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about NAIROBI WATER SUPPLY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “NAIROBI WATER SUPPLY” is an infrastructure initiative in the Water Supply and Storage sector, located in Kenya. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The First Nairobi Water Supply Project, which is expected to increase the capacity of the Nairobi water supply system by 10 million imperial gallons per day, comprises the following: (a) the construction of an intake and ancillary works on the Chania River; (b) the provision and installation of a raw water pumping station; (c) a water treatment plant; (d) a 24-mile long transmission main to Nairobi; (e) a terminal reservoir; (f) strengthening and expansion of the distribution system including provision of water meters; and (g) necessary consulting services.

Original sector

Water, Sanitation and Waste Management

Location

Country

Kenya

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project