Nakusp - Wastewater Treatment Plant (WWTP) Optimization Project
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
The proposed project will upgrade the wastewater treatment plant headworks, aeration system and sludge management system to improve wastewater quality and meet regulatory compliance. The project works will include: - Installation of new headworks screen system. - New aeration system - Sludge management system
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Nakusp - Wastewater Treatment Plant (WWTP) Optimization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will upgrade the wastewater treatment plant headworks, aeration system and sludge management system to improve wastewater quality and meet regulatory compliance. The project works will include: - Installation of new headworks screen system. - New aeration system - Sludge management system |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-04-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
