Nalagarh Electrical Division Reconductoring Project
Awarded · Himachal Pradesh · Last reported Jul 2026
Source: Dailyhunt
Laser Power & Infra Ltd secured a ₹4.15 crore order from Himachal Pradesh State Electricity Board Limited for the supply and installation of advanced high-temperature low-sag conductors. The project involves replacing conventional conductors to enhance transmission capacity while utilizing existing tower infrastructure, aiming to improve power supply reliability in the Nalagarh Electrical Division
- Status
- Closed
- Sector
- Energy
- Location
- Nalagarh, Himachal Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Dailyhunt
ConstructChat
Ask ConstructChat about Nalagarh Electrical Division Reconductoring Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Laser Power & Infra Ltd secured a ₹4.15 crore order from Himachal Pradesh State Electricity Board Limited for the supply and installation of advanced high-temperature low-sag conductors. The project involves replacing conventional conductors to enhance transmission capacity while utilizing existing tower infrastructure, aiming to improve power supply reliability in the Nalagarh Electrical Division, Himachal Pradesh. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Himachal Pradesh |
City | Nalagarh |
Source
Source | Dailyhunt |
URL |
More Details
Record type | Project |
Article published date | 2026-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
