Nalagarh Electrical Division Reconductoring Project
Sector: Power Generation (CCGT) • Location: Nalagarh, Himachal Pradesh, India
Source: Scanx
Laser Power & Infra Limited secured a turnkey reconductoring project order from Himachal Pradesh State Electricity Board Limited (HPSEBL) to replace conventional conductors with advanced High Temperature Low Sag (HTLS) conductors using Aluminium Encapsulated Carbon Core Conductors (AECC) technology. The project aims to enhance power supply reliability and increase transmission capacity without new
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Nalagarh, Himachal Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Scanx
ConstructChat
Ask ConstructChat about Nalagarh Electrical Division Reconductoring Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Laser Power & Infra Limited secured a turnkey reconductoring project order from Himachal Pradesh State Electricity Board Limited (HPSEBL) to replace conventional conductors with advanced High Temperature Low Sag (HTLS) conductors using Aluminium Encapsulated Carbon Core Conductors (AECC) technology. The project aims to enhance power supply reliability and increase transmission capacity without new tower infrastructure or additional right-of-way. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Himachal Pradesh |
City | Nalagarh |
Source
Source | Scanx |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
