logo

Nalón River Viaduct

Sector: Bridge • Location: Asturias, Spain

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Nalón River Viaduct Muros de Nalón, Spain €68.96 M Total Budget 29754 m² Total Area 1100.85 m Total Length The Nalón River viaduct is a structure made of mixed concrete and a steel deck formed by a trapezoidal box complete with cantilevers up to a total width of 27 m. Lengthwise, the work has two differentiated areas. The central part, located over the waterway,

Project Information FAQ

Project Information

5 Q
The project “Nalón River Viaduct” is an infrastructure initiative in the Bridge sector, located in Asturias, Spain. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Nalón River Viaduct Muros de Nalón, Spain €68.96 M Total Budget 29754 m² Total Area 1100.85 m Total Length The Nalón River viaduct is a structure made of mixed concrete and a steel deck formed by a trapezoidal box complete with cantilevers up to a total width of 27 m. Lengthwise, the work has two differentiated areas. The central part, located over the waterway, consists of three spans of variable widths: 76, 124, and 76 m. The accesses located on both sides of the central stretch have a deck with a constant span distributed over 13 segments 60 m on the left margin and a single span of 44.852 m on the right margin. The total length of the viaduct is 1,100.85 m. The building process used was one where the metallic lintel was pushed from the two abutments. From the first abutment, the part of the deck to pylon 10 (660 m in length) is pushed. It corresponds to the end of the circular curve with a radius of 950 m. From abutment 2, the straight segment is pushed to pylon 11, where the intermediate expansion joint is located on the viaduct. In this stretch, the push is marked by the spans of the main viaduct. It was necessary to build a special nose and provisional support pylon in the center of the longest span. Once these two pushes are done, there is one span between pylons 10 and 11 that is lifted into place. There are two types of pylons. Those for the main viaduct, 32 m tall with a lower area and only one stem 9 m high that opens up into two lightly bent connecting rods that form a closed V. The rest of the pylons have a single stem of variable width, ranging from 6.40 m at the base to 10.40 m at the upper part for locating the wearing course on the metal box. The foundation for the pylons and abutments is deep, as 3,828 pilings measuring 1.5 to 2 m in diameter were used.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data