Nam Can II HPP
Sector: Wind • Location: Vietnam
Source: World Bank Group
Nam Can Hydro Electric JSC was planning the development of the 20 MW Nam Can 2 Hydropower Plant, on the Nam Can Stream, at Nam Can and Ta Ca communes, Ky Son District, Nghe An Province.
Annual output was expected to be 70,520 MWh, of which 69,815 MWh was to be exported to the national grid (99.0%). The project was designed to consist of 2 turbines of 10.417 MW each. The emission factor used in th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Nam Can Hydro Electric JSC was planning the development of the 20 MW Nam Can 2 Hydropower Plant, on the Nam Can Stream, at Nam Can and Ta Ca communes, Ky Son District, Nghe An Province. Annual output was expected to be 70,520 MWh, of which 69,815 MWh was to be exported to the national grid (99.0%). The project was designed to consist of 2 turbines of 10.417 MW each. The emission factor used in the CDM appliaction was 0.5764, as supplied by the DNA Vietnam (March 2010). Project IRR with CDM was estimated at 12.43%. The first contract was signed in October 2011. Project life was estimated at 30 years. The CDM credit period was expected to start in January 2014, used here as the commissioning date. Total investment was unknown. Financial closure date was unkonwn, but assumed to be October 2011 (signing of first contracts). http://cdm.unfccc.int/filestorage/H/6/D/H6DX1C7UBRFKLWM0TAGE5O2IZNS39P/PDD_Nam%20Can%202%20Hydropower%20Project.pdf?t=bFd8bTIyZDdsfDCeeDpRDwwdmOe7SJRDdYmL Total cost + FC unknown.. All information from CDM/PDD |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
