Nam Luc Hydropower Plant

Sector: Hydro • Location: Vietnam

Source: World Bank Group

Project
Active

ESACO Namluc Hydropower JSC, an IPP, was planning the development of the 24 MW Nam Luc Hydropower Plant, the Chay river, in the Bac Ha district of Lao Cai Province in northern Vietnam. The project was expected to generate 95,333 MWh annually, to be transmitted to the grid via a 110kV transmission line to the Thac Ba-Yen Bai-Lao Cai Substation.

The project was to comprise of two turbines, 12 MW e

Project Information FAQ

Project Information

5 Q
The project “Nam Luc Hydropower Plant” is an infrastructure initiative in the Hydro sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

ESACO Namluc Hydropower JSC, an IPP, was planning the development of the 24 MW Nam Luc Hydropower Plant, the Chay river, in the Bac Ha district of Lao Cai Province in northern Vietnam. The project was expected to generate 95,333 MWh annually, to be transmitted to the grid via a 110kV transmission line to the Thac Ba-Yen Bai-Lao Cai Substation. The project was to comprise of two turbines, 12 MW each (Bulb - vertical axis), with a lifespan of 25 years. Commissioning was expected for 2013, January. The feasibility study was completed in April 2009. The investment license was awarded in May 2009. The PPA was signed in May 2009. The EIA was approved in June 2009. The first EPC contract was signed in February 2010. Electricity tariff was expected to be VND 803.7 ($0.0386 per kWh). Financial Close was reached in February 2011, for debt with a tenor of 15 years. The debt/equity ratio was 70/30. Totan investment was expected to be VND 533,880 ($25.1 million). Costs were divided as follows: Construction: VND 211,948 Equipment: VND 226,431 Project Management: VND 5,959 Consultancies: VND 18,765 Compensation: VND 8,840 Other cost: VND 5,222 Contingency: VND 45,715 http://cdm.unfccc.int/filestorage/F/K/A/FKAUV4CJGEW3D1P6ZQIMSL5BR09N7X/PDD%20Nam%20Luc.pdf?t=RVd8bTIydHZvfDBCbT9yC0pK0Kr425YhKMTy

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data