Nam Theun 2 Social and Environment Project
Sector: Road • Location: Lao People's Democratic Republic
Source: World Bank Group
The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that will provide 995 MW power for export to Thailand, and an additional 75 MW for domestic use; b) management of environmental and social impacts on the Nakai Plateau, in the NT2 watershed, and in the down-stream areas of the Nam Theun and Xe Bang Fai (XBF) rivers; and, c) monitoring and evaluation arrangements designed to meet sound engineering practices, fiduciary responsibilities, and the respective oversight requirements of the various financial institutions. The project components are as follows. Component I - NT2 Hydropower Facility - comprises a dam (48 meters high) and a 450 km2 reservoir on the Nam Theun River and the Nakai plateau. Water from the reservoir would be transferred to an above-ground power station, located at the foot of the Nakai escarpment. Component 2 - Management of Environmental and Social Impacts - includes: a) the Nakai Plateau where most of the resettlement will occur; b) the NT2 watershed; c) the downstream area along the XBF river and its tributaries; and, d) the downstream area along the lower NT river and its tributaries. The Social Development Plan (SDP) will be implemented, covering: design and construction of resettlement villages, away from the inundation zone; provision of basic infrastructure and social services; and, design and delivery of livelihood programs. The Environmental Assessment and Management Plan (EAMP) will include: environmental mitigation measures on the Nakai Plateau and in the downstream areas; design and implementation of adaptive wildlife management programs; water quality monitoring and management programs in the reservoir and downstream areas; flood control measures; and, implementation of the riparian release measures. The watershed management includes the preparation and implementation of land use plans in a participatory manner, design and implementation of programs to prevent loss of forest cover, wildlife trade and non-sustainable resource use, and, compensation for livelihood impacts due to resource access restrictions. Component 3 - Monitoring and Evaluation - the monitoring and evaluation (M&E) framework consists of: a) supervision of physical implementation of the hydropower project by professional engineering firms; b) independent review of key project components - dam safety and environment and social impacts; c) systematic monitoring of the technical, and environmental and social safeguards components o f the project during construction, and operation by a professional firm; and, d) advisory services on project implementation, including NT2 revenue management arrangements. A mitigation assessment was conducted on key implementation risks, and mitigation measures stipulate the actions to be taken. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
