logo

Nam Theun 2 Social and Environment Project

Sector: Road • Location: Lao People's Democratic Republic

Source: World Bank Group

Project
Closed

The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that

Project Information FAQ

Project Information

5 Q
The project “Nam Theun 2 Social and Environment Project” is an infrastructure initiative in the Road sector, located in Lao People's Democratic Republic. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nam Theun 2 Hydroelectric (NT2) Project seeks to generate revenues through an environmentally and socially sustainable development of NT2's hydropower potential. The project includes a Social and Environment Project (P049290). The Project Appraisal Document (Report No: 31764-LA) covers both projects (P076445 and P049290). This project includes a) the installation of a hydropower facility that will provide 995 MW power for export to Thailand, and an additional 75 MW for domestic use; b) management of environmental and social impacts on the Nakai Plateau, in the NT2 watershed, and in the down-stream areas of the Nam Theun and Xe Bang Fai (XBF) rivers; and, c) monitoring and evaluation arrangements designed to meet sound engineering practices, fiduciary responsibilities, and the respective oversight requirements of the various financial institutions. The project components are as follows. Component I - NT2 Hydropower Facility - comprises a dam (48 meters high) and a 450 km2 reservoir on the Nam Theun River and the Nakai plateau. Water from the reservoir would be transferred to an above-ground power station, located at the foot of the Nakai escarpment. Component 2 - Management of Environmental and Social Impacts - includes: a) the Nakai Plateau where most of the resettlement will occur; b) the NT2 watershed; c) the downstream area along the XBF river and its tributaries; and, d) the downstream area along the lower NT river and its tributaries. The Social Development Plan (SDP) will be implemented, covering: design and construction of resettlement villages, away from the inundation zone; provision of basic infrastructure and social services; and, design and delivery of livelihood programs. The Environmental Assessment and Management Plan (EAMP) will include: environmental mitigation measures on the Nakai Plateau and in the downstream areas; design and implementation of adaptive wildlife management programs; water quality monitoring and management programs in the reservoir and downstream areas; flood control measures; and, implementation of the riparian release measures. The watershed management includes the preparation and implementation of land use plans in a participatory manner, design and implementation of programs to prevent loss of forest cover, wildlife trade and non-sustainable resource use, and, compensation for livelihood impacts due to resource access restrictions. Component 3 - Monitoring and Evaluation - the monitoring and evaluation (M&E) framework consists of: a) supervision of physical implementation of the hydropower project by professional engineering firms; b) independent review of key project components - dam safety and environment and social impacts; c) systematic monitoring of the technical, and environmental and social safeguards components o f the project during construction, and operation by a professional firm; and, d) advisory services on project implementation, including NT2 revenue management arrangements. A mitigation assessment was conducted on key implementation risks, and mitigation measures stipulate the actions to be taken.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data