Song Da No 9.06 JSC, a subsidiary of Song Da Corporation, developed the 12.0MW Nam Xay Noi 2 small hydropower plant, on Nam Xay Noi stream, Nam Xay and Nam Xe communes, Van Ban district, Lao Cai province. The project was expected to generate 44,970 MWh anually. The project consisted of 3 Pelton turbines with horizontal shaft, of 4.179MW each and 88.75% efficiency.

The project held a PPA with Ele

Project Information FAQ

Project Information

4 Q
The project “Nam Xay Noi II SHPP” is an infrastructure initiative in the Road sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Song Da No 9.06 JSC, a subsidiary of Song Da Corporation, developed the 12.0MW Nam Xay Noi 2 small hydropower plant, on Nam Xay Noi stream, Nam Xay and Nam Xe communes, Van Ban district, Lao Cai province. The project was expected to generate 44,970 MWh anually. The project consisted of 3 Pelton turbines with horizontal shaft, of 4.179MW each and 88.75% efficiency. The project held a PPA with Electricity Corporation of Vietnam (EVN). The pre-study of 6MW was finalized in May 2007. The revised feasibility study report (12MW) was finalized in April 2008. The investment license was issued in March 2010. The construction contract was signed in June 2010. The construction contract for the NV5 road was signed in August 2010. The construction for the pen stock was signed in November 2010. The construction period was 2.5 years. The lifetime of the project was 30 years. The expected electricity tariff was VND 724.57/kWh. Income tax was 25%. Commissioning was expected for October 2012. Financial closure was reported in March 2011 with the signing of the credit contact. The expected cost of equity was 19.13%, following 70/30 debt to equity and debt costing 10.5% the WACC was expected to be 11.25%. Total investment was VND 267.6 billion (US$12.84 million). The project applied for UNFCCC CDM financing. The coordinates of the project: Northern latitude +21.948611 Eastern longitude +104.030556 http://cdm.unfccc.int/filestorage/6/T/3/6T379QF4W5VMUA1JDCHKIN0R2PSLOZ/PDD.pdf?t=SHd8bWkyb2R2fDBg3jJ1P6Mi6u-K5NtXm1Ii

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data