Nam Xay Noi II SHPP

Sector: Road • Location: Vietnam

Source: World Bank Group

Project
Active

Song Da No 9.06 JSC, a subsidiary of Song Da Corporation, developed the 12.0MW Nam Xay Noi 2 small hydropower plant, on Nam Xay Noi stream, Nam Xay and Nam Xe communes, Van Ban district, Lao Cai province. The project was expected to generate 44,970 MWh anually. The project consisted of 3 Pelton turbines with horizontal shaft, of 4.179MW each and 88.75% efficiency.

The project held a PPA with Ele

Status
Prospective
Sector
Road, Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Nam Xay Noi II SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Nam Xay Noi II SHPP” is an infrastructure initiative in the Road sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Song Da No 9.06 JSC, a subsidiary of Song Da Corporation, developed the 12.0MW Nam Xay Noi 2 small hydropower plant, on Nam Xay Noi stream, Nam Xay and Nam Xe communes, Van Ban district, Lao Cai province. The project was expected to generate 44,970 MWh anually. The project consisted of 3 Pelton turbines with horizontal shaft, of 4.179MW each and 88.75% efficiency. The project held a PPA with Electricity Corporation of Vietnam (EVN). The pre-study of 6MW was finalized in May 2007. The revised feasibility study report (12MW) was finalized in April 2008. The investment license was issued in March 2010. The construction contract was signed in June 2010. The construction contract for the NV5 road was signed in August 2010. The construction for the pen stock was signed in November 2010. The construction period was 2.5 years. The lifetime of the project was 30 years. The expected electricity tariff was VND 724.57/kWh. Income tax was 25%. Commissioning was expected for October 2012. Financial closure was reported in March 2011 with the signing of the credit contact. The expected cost of equity was 19.13%, following 70/30 debt to equity and debt costing 10.5% the WACC was expected to be 11.25%. Total investment was VND 267.6 billion (US$12.84 million). The project applied for UNFCCC CDM financing. The coordinates of the project: Northern latitude +21.948611 Eastern longitude +104.030556 http://cdm.unfccc.int/filestorage/6/T/3/6T379QF4W5VMUA1JDCHKIN0R2PSLOZ/PDD.pdf?t=SHd8bWkyb2R2fDBg3jJ1P6Mi6u-K5NtXm1Ii

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project