logo

Namibia - Northern Railway Extension Project

Sector: Manufacturing (Industrial) • Location: Namibia

Source: African Development Bank (AfDB)

Project

The proposed Northern Railway Extension project would facilitate balanced development of infrastructure facilities in the regions/areas, which were hitherto neglected. It involves the extension of the rail line from Tsumeb to Ondangwa (248 km). These areas have been identified as critical for economic growth and poverty reduction. Any improvement or expansion to the existing transport infrastructu

Project Information FAQ

Project Information

4 Q
The project “Namibia - Northern Railway Extension Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Namibia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Northern Railway Extension project would facilitate balanced development of infrastructure facilities in the regions/areas, which were hitherto neglected. It involves the extension of the rail line from Tsumeb to Ondangwa (248 km). These areas have been identified as critical for economic growth and poverty reduction. Any improvement or expansion to the existing transport infrastructure facilities in these areas would stimulate economic growth, promote regional integration and economic co-operation between Namibia and Angola through trade links. The construction of the new rail link is a major step towards development of the “Namibe-Lubango-Oshikango-Walvis Bay Corridor” which has been identified as priority for both Governments of Namibia and Angola. It would contribute to the national policy objective of sustained economic development in the northern regions. The overall project will be implemented over a period of 40 months with a total cost estimated at UA 49.32 million, net of taxes and duties.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data