logo
Project

Namibia - Northern Railway Extension Project

Sector: Manufacturing (Industrial) • Location: Namibia

Source: African Development Bank (AfDB)

The proposed Northern Railway Extension project would facilitate balanced development of infrastructure facilities in the regions/areas, which were hitherto neglected. It involves the extension of the rail line from Tsumeb to Ondangwa (248 km). These areas have been identified as critical for economic growth and poverty reduction. Any improvement or expansion to the existing transport infrastructu

Sector
Manufacturing (Industrial), Rail, Mass Transit, Raw Materials, Road, Government
Location
Namibia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Namibia - Northern Railway Extension Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Namibia - Northern Railway Extension Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Namibia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed Northern Railway Extension project would facilitate balanced development of infrastructure facilities in the regions/areas, which were hitherto neglected. It involves the extension of the rail line from Tsumeb to Ondangwa (248 km). These areas have been identified as critical for economic growth and poverty reduction. Any improvement or expansion to the existing transport infrastructure facilities in these areas would stimulate economic growth, promote regional integration and economic co-operation between Namibia and Angola through trade links. The construction of the new rail link is a major step towards development of the “Namibe-Lubango-Oshikango-Walvis Bay Corridor” which has been identified as priority for both Governments of Namibia and Angola. It would contribute to the national policy objective of sustained economic development in the northern regions. The overall project will be implemented over a period of 40 months with a total cost estimated at UA 49.32 million, net of taxes and duties.

Original sector

Transport & Storage

Budget

Location

Country

Namibia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Rail, Mass Transit, Raw Materials, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project