Nanaimo Regional District - French Creek Pollution Control Centre Heat Recovery and Solar
Pre-construction · British Columbia
Source: Infrastructure Canada
The proposed project will upgrade the French Creek Pollution Control Centre (FCPCC) wastewater treatment plant with wastewater effluent heat recovery, approximately 45 kW of solar photovoltaic panels, backup heating, and direct digital controls. The project will increase the energy efficiency of buildings by producing clean heat and electricity to offset approximately 240 GJ/yr of natural gas and
- Status
- Prospective
- Sector
- Water Supply and Storage, Solar, Natural Gas, Commercial, Power Generation (CCGT), Road
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Nanaimo Regional District - French Creek Pollution Control Centre Heat Recovery and Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will upgrade the French Creek Pollution Control Centre (FCPCC) wastewater treatment plant with wastewater effluent heat recovery, approximately 45 kW of solar photovoltaic panels, backup heating, and direct digital controls. The project will increase the energy efficiency of buildings by producing clean heat and electricity to offset approximately 240 GJ/yr of natural gas and 49,000 kWh/yr of grid electricity use. The project works will complement other upgrades being made to the FCPCC to expand facility capacity and improve odour control. The project works include: - solar photovoltaic (PV) panels totalling approximately 44.7 kW capacity; - PV mounting hardware and power regulation/monitoring equipment; - water-source heat pumps and fittings; - air-handling units, air conditioning unit, and associated ducts and fittings; - hydronic and baseboard heaters, emergency boiler, and circulator pumps; - building automation system; - and site work, access roads/paths, mechanical, electrical, control/monitoring, signage, and other related works and appurtenances. |
Original sector | Green Energy |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Solar, Natural Gas, Commercial, Power Generation (CCGT), Road |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
