Nance North Drainage Improvements
Sector: Water Supply and Storage • Location: San Marcos, Texas, United States of America
Source: Dodge USA
Basin study and storm sewer upsizing improvements along Nance and North from MLK to Hopkins St. Approx. 1400 LF. Replace conflicts of water and wastewater, and relocate electric poles. Total Reconstruction throughout the project limits. This project needs to occur after the Shady Valley Gravel Utility Improvement project and before the Old RR12/Moore Street Reconstruction project. This is the seco
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Raw Materials
- Location
- San Marcos, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Nance North Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Basin study and storm sewer upsizing improvements along Nance and North from MLK to Hopkins St. Approx. 1400 LF. Replace conflicts of water and wastewater, and relocate electric poles. Total Reconstruction throughout the project limits. This project needs to occur after the Shady Valley Gravel Utility Improvement project and before the Old RR12/Moore Street Reconstruction project. This is the second of three drainage projects. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Marcos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Raw Materials |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
