logo

Nanning Second Ring Road (Southern Section and Wulong Road Extension) Expressway

Sector: Airport • Location: China

Source: World Bank Group

Project
Active

is PPP project includes two sub-projects: the Nanning South Crossing Line (Liujing to Datang Section) road project and the Nanning South Crossing Line (Wuwei Airport to Long'an Extension) road project. Nanning South Transit Line (Liujing to Datang Section) Highway Engineering Project Nanning South Transit Line (Liujing to Datang Section) highway is located in the southern part of Guangxi. The proj

Project Information FAQ

Project Information

4 Q
The project “Nanning Second Ring Road (Southern Section and Wulong Road Extension) Expressway” is an infrastructure initiative in the Airport sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

is PPP project includes two sub-projects: the Nanning South Crossing Line (Liujing to Datang Section) road project and the Nanning South Crossing Line (Wuwei Airport to Long'an Extension) road project. Nanning South Transit Line (Liujing to Datang Section) Highway Engineering Project Nanning South Transit Line (Liujing to Datang Section) highway is located in the southern part of Guangxi. The project is located in Heng County, Yongning District and Liangqing District of Nanning City. The overall direction of the route is from east to west. The total construction mileage of the project is 55.051km, the highway construction mileage is 52.206km, and the secondary highway construction mileage is 2.845km. The main line adopts the new two-way four-lane expressway standard, the design speed is 120km/h, and the roadbed width is 26.5m. The Zhonghe and Baiji connecting line adopts the second-class highway standard, the design speed is 60Km/h, and the roadbed width is 12m. A total of 5 interchanges are constructed in this project, 1 service area and 2 toll stations. The highway engineering project of Nanning South Transit Line (Wuwei Airport to Long'an Extension) is located in Xixiangtang District and Long'an County, Nanning City. The overall direction of the route is from southwest to northeast. The total construction mileage of the project is 31.302km, the expressway construction mileage is 14.302km, and the secondary road construction mileage is 17.000km; the main line adopts the standard of new two-way four-lane expressway, the design speed is 120km/h, and the roadbed width is 28m. The connecting line adopts the secondary highway standard, the design speed is 60Km/h, and the roadbed width is 12m. The project company will construct, operate and hand over the project. Total investment stands at nearly 10 billion yuans or $ 1.574 billion. Financial close was reached on December 20, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/c07766ef5e5948cf8d2bbccbc8603f68

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data