Nanning Second Ring Road (Southern Section and Wulong Road Extension) Expressway
Sector: Airport • Location: China
Source: World Bank Group
is PPP project includes two sub-projects: the Nanning South Crossing Line (Liujing to Datang Section) road project and the Nanning South Crossing Line (Wuwei Airport to Long'an Extension) road project. Nanning South Transit Line (Liujing to Datang Section) Highway Engineering Project Nanning South Transit Line (Liujing to Datang Section) highway is located in the southern part of Guangxi. The proj
- Status
- Prospective
- Sector
- Airport, Road, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Nanning Second Ring Road (Southern Section and Wulong Road Extension) Expressway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | is PPP project includes two sub-projects: the Nanning South Crossing Line (Liujing to Datang Section) road project and the Nanning South Crossing Line (Wuwei Airport to Long'an Extension) road project. Nanning South Transit Line (Liujing to Datang Section) Highway Engineering Project Nanning South Transit Line (Liujing to Datang Section) highway is located in the southern part of Guangxi. The project is located in Heng County, Yongning District and Liangqing District of Nanning City. The overall direction of the route is from east to west. The total construction mileage of the project is 55.051km, the highway construction mileage is 52.206km, and the secondary highway construction mileage is 2.845km. The main line adopts the new two-way four-lane expressway standard, the design speed is 120km/h, and the roadbed width is 26.5m. The Zhonghe and Baiji connecting line adopts the second-class highway standard, the design speed is 60Km/h, and the roadbed width is 12m. A total of 5 interchanges are constructed in this project, 1 service area and 2 toll stations. The highway engineering project of Nanning South Transit Line (Wuwei Airport to Long'an Extension) is located in Xixiangtang District and Long'an County, Nanning City. The overall direction of the route is from southwest to northeast. The total construction mileage of the project is 31.302km, the expressway construction mileage is 14.302km, and the secondary road construction mileage is 17.000km; the main line adopts the standard of new two-way four-lane expressway, the design speed is 120km/h, and the roadbed width is 28m. The connecting line adopts the secondary highway standard, the design speed is 60Km/h, and the roadbed width is 12m. The project company will construct, operate and hand over the project. Total investment stands at nearly 10 billion yuans or $ 1.574 billion. Financial close was reached on December 20, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/c07766ef5e5948cf8d2bbccbc8603f68 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Airport, Road, Government, Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in China
- Beilungang CoalFired
- Zhuhai airport concession
- Dabie Mountain General Aviation Airport
- Chengdu Tianfu International Airport New City Road Project
- Hainan Meilan Airport
- Qingzhou Min River Bridge & Airport Highway
- Guilin City - Liang Jiang Airport Toll Road
- Chengdu Tianfu International Airport New City Tunxi South and North City Road Project
