Nanning Shuitang River Integrated Restoration PPP Project
Closed · China
Source: InfraPPPWorld
The Nanning Shuitang River Integrated Restoration Public-Private Partnership Project in Guangxi Zhuang Autonomous Region has a concession period of 22 years (a two-year construction period inclusive), and its business scope includes river training, river interception engineering, river ecological restoration, sponge city construction, environmental landscaping and information management works with
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Nanning Shuitang River Integrated Restoration PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Nanning Shuitang River Integrated Restoration Public-Private Partnership Project in Guangxi Zhuang Autonomous Region has a concession period of 22 years (a two-year construction period inclusive), and its business scope includes river training, river interception engineering, river ecological restoration, sponge city construction, environmental landscaping and information management works within the planned red line area at the Shuitang River. In addition, the Project includes the construction and operation of a waste water treatment plant with a designed daily treatment capacity of 40,000 tonnes. |
Original sector | Water & Waste |
Procurement method |
Location
Country | China |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
