Nano-bubble pilot project in Tijuana River
The owner, status and timeline of this project. A free account opens every field.
Source: CW39 Houston
A pilot project launched by the International Boundary and Water Commission to pump ozone nano bubbles into the Tijuana River to help clean chemicals and sewage pollution. The project aimed to reduce odors and bacteria but was heavily criticized and the equipment was destroyed and swept away during a storm.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- CW39 Houston
ConstructChat
Ask ConstructChat about Nano-bubble pilot project in Tijuana River
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | failed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A pilot project launched by the International Boundary and Water Commission to pump ozone nano bubbles into the Tijuana River to help clean chemicals and sewage pollution. The project aimed to reduce odors and bacteria but was heavily criticized and the equipment was destroyed and swept away during a storm. |
Original sector | Environmental Remediation |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | CW39 Houston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
