logo
ProjectClosed

NanoFab Reflection at Albany NanoTech Complex

One of 10,000+ projects Taiyo tracks in New York.

Source: Dodge

Construct the NanoFab Reflection 50,000 SF Clean Room with a waffle table (ISO Class 5) + 50,000 SF of non-clean subfab. Will have two levels of clean space, two additional levels of support space above the operating level, and a penthouse on the roof. Includes also an expansion for the existing HPM storage building, other supporting buildings, replacement of two electrical transformers, and a new

Status
Closed
Sector
Cement, Automotive, Electric Vehicles (EVs), Manufacturing (Industrial), Car parking, Commercial, Power Generation (CCGT)
Location
Albany, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NanoFab Reflection at Albany NanoTech Complex

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NanoFab Reflection at Albany NanoTech Complex” is an infrastructure initiative in the Cement sector, located in Albany, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct the NanoFab Reflection 50,000 SF Clean Room with a waffle table (ISO Class 5) + 50,000 SF of non-clean subfab. Will have two levels of clean space, two additional levels of support space above the operating level, and a penthouse on the roof. Includes also an expansion for the existing HPM storage building, other supporting buildings, replacement of two electrical transformers, and a new 4-level/400-space covered parking garage, with at least 30 spots with electrical vehicle chargin...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Albany

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Automotive, Electric Vehicles (EVs), Manufacturing (Industrial), Car parking, Commercial, Power Generation (CCGT)

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project