logo

Nansha Port Phase II

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

An agreement was signed between COSCO Pacific Limited and Guangzhou Port Group Co., Ltd. on 16 April 2005 to set up a joint venture company to build and operate a container terminal at Nansha Port Phase II in Guangzhou City, Guangdong Province.

The total investment amount of the joint venture company will be approximately RMB4.01 billion and the registered capital will be approximately RMB1.40

Project Information FAQ

Project Information

4 Q
The project “Nansha Port Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

An agreement was signed between COSCO Pacific Limited and Guangzhou Port Group Co., Ltd. on 16 April 2005 to set up a joint venture company to build and operate a container terminal at Nansha Port Phase II in Guangzhou City, Guangdong Province. The total investment amount of the joint venture company will be approximately RMB4.01 billion and the registered capital will be approximately RMB1.40 billion (US$ 503.14 million). COSCO Pacific holds a 56% equity interest in the joint venture company through its subsidiary, COSCO Ports (Nansha) Limited. COSCO Ports (Nansha) Limited will pay a cash consideration of approximately US$95 million for its share in the registered capital of the joint venture company. AP Moller - Maersk Group holds 33.9 stake of COSCO Ports (Nansha) Limited. Nansha Phase II Terminal will have 6 deep-water berths in total with a quay length of 2,100 meters, a water depth alongside of 14.5 meters, which could be dredged to 17 meters, and a total area of about 2,730,000 square meters. Its annual handling capacity will be up to 4,200,000 TEUs and is expected to be operational in 2006. As the only deep-water port in Guangzhou City, Nansha is capable of serving the fifth and the sixth generation container vessels. It has excellent geographic location, with its hinterland of the Pearl River Delta as one of the most developed areas in China.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data