logo

Nansha Port Phase II

Sector: Commercial • Location: Guangdong, China

Source: World Bank Group

Project
Active

An agreement was signed between COSCO Pacific Limited and Guangzhou Port Group Co., Ltd. on 16 April 2005 to set up a joint venture company to build and operate a container terminal at Nansha Port Phase II in Guangzhou City, Guangdong Province.

The total investment amount of the joint venture company will be approximately RMB4.01 billion and the registered capital will be approximately RMB1.40

Status
Prospective
Sector
Commercial, Water Supply and Storage, Seaport, Government
Location
Guangdong, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Nansha Port Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Nansha Port Phase II” is an infrastructure initiative in the Commercial sector, located in Guangdong, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An agreement was signed between COSCO Pacific Limited and Guangzhou Port Group Co., Ltd. on 16 April 2005 to set up a joint venture company to build and operate a container terminal at Nansha Port Phase II in Guangzhou City, Guangdong Province. The total investment amount of the joint venture company will be approximately RMB4.01 billion and the registered capital will be approximately RMB1.40 billion (US$ 503.14 million). COSCO Pacific holds a 56% equity interest in the joint venture company through its subsidiary, COSCO Ports (Nansha) Limited. COSCO Ports (Nansha) Limited will pay a cash consideration of approximately US$95 million for its share in the registered capital of the joint venture company. AP Moller - Maersk Group holds 33.9 stake of COSCO Ports (Nansha) Limited. Nansha Phase II Terminal will have 6 deep-water berths in total with a quay length of 2,100 meters, a water depth alongside of 14.5 meters, which could be dredged to 17 meters, and a total area of about 2,730,000 square meters. Its annual handling capacity will be up to 4,200,000 TEUs and is expected to be operational in 2006. As the only deep-water port in Guangzhou City, Nansha is capable of serving the fifth and the sixth generation container vessels. It has excellent geographic location, with its hinterland of the Pearl River Delta as one of the most developed areas in China.

Original sector

Transport

Budget

Location

Country

China

State

Guangdong

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Seaport, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project