logo

Nanshan Road Phase II & Yuhuangshan Outer Ring Road Project

Sector: Road • Location: China

Source: World Bank Group

Project
Active

The project includes the financing, construction, operation and maintenance of two roads located in Qinshui County, Shanxi Province, China. The first road is the second phase of Nanshan Road project in Jincheng City, which has a total length of 5.187km; and the second road is the Yuhuangshan Outer Ring Road which has two main and two branch lines with a total length of 5.828km. The BOT concession

Project Information FAQ

Project Information

5 Q
The project “Nanshan Road Phase II & Yuhuangshan Outer Ring Road Project” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the financing, construction, operation and maintenance of two roads located in Qinshui County, Shanxi Province, China. The first road is the second phase of Nanshan Road project in Jincheng City, which has a total length of 5.187km; and the second road is the Yuhuangshan Outer Ring Road which has two main and two branch lines with a total length of 5.828km. The BOT concession is for a period of 22 years and has been awarded to a consortium Shanxi Construction Engineering Group Co. (80%) and Qinshui County Hengda Urban Development Investment Co. (20%), following a competitive bidding process. The project company is called Qinshui Road Network Project Management Co., Ltd. The total value of the project is $73.19 million and financial close was achieved on 13 May, 2022. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/0670bbfc3b35474b99a479a3f6bbb101

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data