Napa Junction 3MW Solar and Recreational Storage
Sector: Residential • Location: American Canyon, California, United States of America
Source: Dodge
develop a 3-megawa1 solar facility on a 6.68-acre site at this site. Approximately 5,136 solar panels would be installed on-site with approximately 52 micro-inverters. The approximately 125,000 square feet of solar panels would generate approximately three megawa1s (MW) of alterna)ng current (AC) renewable energy. As an accessory use to the solar facility, the project includes 253 surface parking
- Status
- Prospective
- Sector
- Residential, Automotive, Power Generation (CCGT), Commercial, Car parking, Raw Materials, Consumer Products, Solar
- Location
- American Canyon, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Napa Junction 3MW Solar and Recreational Storage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | develop a 3-megawa1 solar facility on a 6.68-acre site at this site. Approximately 5,136 solar panels would be installed on-site with approximately 52 micro-inverters. The approximately 125,000 square feet of solar panels would generate approximately three megawa1s (MW) of alterna)ng current (AC) renewable energy. As an accessory use to the solar facility, the project includes 253 surface parking spaces for boats or Recrea)onal Vehicles (RVs) storage, a 600 SF office, and RV dump sta)ons in t... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | American Canyon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Automotive, Power Generation (CCGT), Commercial, Car parking, Raw Materials, Consumer Products, Solar |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- CR 649/PLEASANT HOME RD @ CSX RR/ID 633746U
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- CUMBERLAND MULTI-MODAL PATH - SEGMENT E
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
