Narayanapur Left Bank Canal [NLBC] Project
One of 9,331 projects Taiyo tracks in Karnataka.
Source: India Investment Grid (IIG)
Information Water Resources-KA has come up with Narayanapur Left Bank Canal [NLBC] Project with a ticket size of 2405.84 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Narayanapur Left Bank Canal [NLBC] under Upper Krishna Project is the l
- Status
- Closed
- Sector
- Fertilizers, Water Supply and Storage, Raw Materials, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Yadgir, Karnataka, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Narayanapur Left Bank Canal [NLBC] Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Water Resources-KA has come up with Narayanapur Left Bank Canal [NLBC] Project with a ticket size of 2405.84 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Narayanapur Left Bank Canal [NLBC] under Upper Krishna Project is the life line canal in Northern Karnataka irrigating 4.50 lakh hectares of command area spread over in perennially drought prone districts of Kalaburagi, Yadagiri and Vijayapura. The distribution network under NLBC includes five main branch canals viz- Indi branch canal, Jewargi branch canal, Mudbal branch canal, Shahapur branch canal andHunasagi branch canal and their sub systems. These canals had been completed between 1982 to 1997 and since then commissioned for irrigation purpose. The NLBC system, which is in operation for about 3 decades had developed certain deficiencies in its capacity to deliver the required quantum of water for irrigation to its command area, especially to the tail end farmers depriving them of their rights for irrigation. Optimum water use efficiency was not being attained due to [a] damage in the canal network systems, [b] failure of slope and seepages in the canal network, [c] absence of proper rotation system and management of flow of water, [d] absence of proper regulating arrangements, and [e] farmers growing water intensive crops in an unscientific manner resulting in usage of excess water. As such, command area to an extent of about 1.05 lakh ha under the project was not getting required quantities of irrigation water. In addition to this, absence of proper drainage resulted in water logging and subsequent salinity and alkalinity in the command area to an extent of 37580 ha |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Karnataka |
City | Yadgir |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Fertilizers, Water Supply and Storage, Raw Materials, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Fertilizers projects in India
- Essar Oil Refinery, Vadinar, Gujarat
- Nagarjuna Oil Corporation’s Cuddalore Refinery, Tamil Nadu
- Ratnagiri Oil Refinery and Petrochemical Complex
- KNR Muzaffarpur Barauni Tollways Private Limited
- Dishman Carbogen Amcis API Facility, Bavla, Ahmedabad, India
- Community Irrigation Project in Jharkhand
- Kutch Railway Company Limited
- BORL Bina Refinery, Madhya Pradesh
