NAS Building 2 Hangar Improvements SOLE SOURCE
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Contract involves three elements of work: 1) Base Bid Remove and replacement the existing low-slope membrane roof systems on indicated Roof Areas A through D in their entirety, and design and install replacement roof system, including but not limited to, roof covering, insulation, flashings and trim, penetrations, nailers and blocking, sheet metal work, accessories and components necessary for a w
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Metal, Airport, Commercial
- Location
- Meridian, Mississippi, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NAS Building 2 Hangar Improvements SOLE SOURCE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Contract involves three elements of work: 1) Base Bid Remove and replacement the existing low-slope membrane roof systems on indicated Roof Areas A through D in their entirety, and design and install replacement roof system, including but not limited to, roof covering, insulation, flashings and trim, penetrations, nailers and blocking, sheet metal work, accessories and components necessary for a watertight roof system assembly. 2) Bid option 01 was also awarded, which requires the installatio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Meridian |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Metal, Airport, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
