Naser Road Water Line Relocation
Sector: Road • Location: North Versailles Township, Pennsylvania, United States of America
Source: Dodge
The Project includes the following Work: The work generally includes the construction of 545 linear feet of eight 8 inch ductile iron pipe and 508 linear feet of sixteen 16 inch ductile iron pipe south of Old Naser Road near the existing MAWC water tanks through the intersection of Old Naser Road and US Route 30. Construction will be in accordance with MAWC standards. Pipe and associated fittings
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project includes the following Work: The work generally includes the construction of 545 linear feet of eight 8 inch ductile iron pipe and 508 linear feet of sixteen 16 inch ductile iron pipe south of Old Naser Road near the existing MAWC water tanks through the intersection of Old Naser Road and US Route 30. Construction will be in accordance with MAWC standards. Pipe and associated fittings to be supplied by MAWC. Connections to existing lines to be made by MAWC crews. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
