Nashik Metro Neo Project
One of 10,000+ projects Taiyo tracks in India.
Source: Asian Development Bank (ADB)
Metro neo at Nashik is likely to be the first in India. It is designed to cater to the needs of smaller cities and costs much less than heavy metro rail systems, prevalent in many cities in India. The project will comprise a mass transit system along two corridors to provide comfortable, safe, reliable, and fast connectivity between important activity centers and transit hubs; and meet the rising
- Status
- Failure
- Sector
- Mass Transit, Road, Energy Storage, Residential, Rail, Commercial, Government, Education
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Nashik Metro Neo Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Dropped / Terminated |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Metro neo at Nashik is likely to be the first in India. It is designed to cater to the needs of smaller cities and costs much less than heavy metro rail systems, prevalent in many cities in India. The project will comprise a mass transit system along two corridors to provide comfortable, safe, reliable, and fast connectivity between important activity centers and transit hubs; and meet the rising transport demand in the city. The metro neo will have articulated or standard electric coaches with rubber tires and an overhead traction system, and will run on an entirely elevated corridor with a curb guidance system. These electric coaches will also be capable of running on the proposed feeder routes using built-in batteries, which will allow them to run without overhead traction for about 20 km. The batteries will be charged while the trains are operating with overhead traction, and will eliminate any need for separate charging stations.The detailed project report has already been prepared. Topographical and geotechnical surveys for both corridors, and preliminary designs have been done for all stations. Maha Metro has also constructed a life-size prototype of the metro neo at Nagpur, which is about 100 meters long, on an elevated alignment, and has one station. A prototype rolling stock has also been placed adjacent to the station. The prototype will give adequate design input for preparing the detailed design of the project for civil structures, rolling stock, signaling system, station design, as well as intermodal integration at stations. Approved by Government of Maharashtra and recommended by the Public Investment Board for approval by the national governmentthe detailed design and award of contracts will commence after final approval, which is still being awaited. In addition to the resources being organized, project preparation can tap, as needed, into the resources of the transaction TA facility Strengthening Capacity to Design and Implement Transport Infrastructure Projects. |
Original sector | Transport |
Budget |
Location
Country | India |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Energy Storage, Residential, Rail, Commercial, Government, Education |
Article published date | 2024-10-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
