Nasirabad Kekri Deoli Road SH - 26
Sector: Road • Location: India
Source: World Bank Group
In August 2005, Public Works Department (PWD)of Government of Rajasthan signed a 7 year concession contract (including 12 month of construction period) to India’s Murari Lal Agarwal Construction Pvt. Ltd. to strengthen the 31.5 km section on State Highway 26 (SH 26) between Nasirabad, Kekri and Deoli in the state of Rajasthan.
Under the contract, Murari Lal Agarwal Construction Pvt. Ltd. was resp
- Status
- Prospective
- Sector
- Road, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Nasirabad Kekri Deoli Road SH - 26
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2005, Public Works Department (PWD)of Government of Rajasthan signed a 7 year concession contract (including 12 month of construction period) to India’s Murari Lal Agarwal Construction Pvt. Ltd. to strengthen the 31.5 km section on State Highway 26 (SH 26) between Nasirabad, Kekri and Deoli in the state of Rajasthan. Under the contract, Murari Lal Agarwal Construction Pvt. Ltd. was responsible for the rehabilitation, finance, operation and maintenance of the existing two-lane highway. The project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. Murari Lal Agarwal Construction Pvt. Ltd. won the tender through competitive bidding, conducted by PWD, Rajasthan, by requesting the lowest concession period of 7 years. The SPV was to recover the capital costs and operating costs including returns through tolls during the concession period (excluding construction period). The concession agreement for the project was signed in August 2005. The total capital cost of the project was estimated at US$ 5 million. Construction on the project began in August 2005 and was expected to be completed by August 2006. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-09-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited