NATIONAL DRAINAGE
Sector: Water Supply and Storage • Location: Egypt, Arab Republic of
Source: World Bank Group
The overall objectives of the project are to: (a) increase agricultural productivity by evacuating excess water and salts from undrained areas, reversing the current land deterioration trend; and (b) improve institutional planning and the implementation capacity of the drainage subsector. This project finances a six-year period of the National Drainage Program (NDP), covering about 720,000 fedda
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The overall objectives of the project are to: (a) increase agricultural productivity by evacuating excess water and salts from undrained areas, reversing the current land deterioration trend; and (b) improve institutional planning and the implementation capacity of the drainage subsector. This project finances a six-year period of the National Drainage Program (NDP), covering about 720,000 feddans (fed) and encompassing the installation or replacement of subsurface drains and the remodeling of existing open drains throughout the Nile Valley and Delta. Vertical drains will be installed as a pilot effort on 5,000 feddans. Technical assistance and training will be provided to address contractor weaknesses and to assist in the strengthening of EPADP. A coordinated monitoring and evaluation program will be introduced. Special emphasis will be given to adaptive research for drain installation in unstable soils, drainage in heavy clay soils, vertical drainage and the used of PVC pipe for collectors. In order to reduce fiscal constraints, an improved system for the recovery of investment and O&M costs related to subsurface drainage will be worked out and implemented. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
