National Electric Vehicle Infrastructure (NEVI) Program
One of 10,000+ projects Taiyo tracks in United States.
Source: Connecticut Public
The NEVI program aims to expand the network of electric vehicle charging stations across the United States. It was established to improve access to charging stations and facilitate the transition from gas and diesel vehicles to electric vehicles. The program is currently under review, pausing $3 billion in funding for future projects while existing contracts will still be honored.
- Status
- Failure
- Sector
- Electric Vehicles (EVs), Automotive
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Connecticut Public
ConstructChat
Ask ConstructChat about National Electric Vehicle Infrastructure (NEVI) Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Paused |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The NEVI program aims to expand the network of electric vehicle charging stations across the United States. It was established to improve access to charging stations and facilitate the transition from gas and diesel vehicles to electric vehicles. The program is currently under review, pausing $3 billion in funding for future projects while existing contracts will still be honored. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
Source
Source | Connecticut Public |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States
- New Orleans BioInnovation Center
- MSU Grand Rapids Research Centre, Michigan, USA
- Silver Line Gateway Project, Massachusetts
- Arranta’s New Commercial-Ready Manufacturing Facility, Watertown, Massachusetts
- Upsher-Smiths’ Pharmaceutical Manufacturing Facility, Minnesota, USA
- Annual Meeting of Stockholders
- HVIP Deadline Approaching: Don’t Miss Out on Incentives for Your Zero-Emission Fleet Before 2025
- Xos DC Fast Chargers
