National Electricity Plan
Sector: Power Generation (CCGT) • Location: India
Source: Kashmir Convener
The National Electricity Plan aims to expand the transmission network in India to meet a peak demand of 458 GW by 2032, with a total cost of Rs 9.15 lakh Crores. It includes significant upgrades to the transmission infrastructure and capacity.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Kashmir Convener
ConstructChat
Ask ConstructChat about National Electricity Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The National Electricity Plan aims to expand the transmission network in India to meet a peak demand of 458 GW by 2032, with a total cost of Rs 9.15 lakh Crores. It includes significant upgrades to the transmission infrastructure and capacity. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | Kashmir Convener |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission |
Article published date | 2025-01-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
