National Rural Infrastructure Project
One of 1,351 projects Taiyo tracks in Mali.
Source: World Bank Group
The National Rural Infrastructure Program Project for Mali aims to reduce poverty and improve the livelihood of the rural population by accelerating the provision, and enhancing the sustainability, of basic rural infrastructure in irrigation and transport; output markets and social services; and water supply and sanitation. The project has two 5-year phases and is supported through an Adaptable Pr
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government, Education, Commercial
- Location
- Mali
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about National Rural Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The National Rural Infrastructure Program Project for Mali aims to reduce poverty and improve the livelihood of the rural population by accelerating the provision, and enhancing the sustainability, of basic rural infrastructure in irrigation and transport; output markets and social services; and water supply and sanitation. The project has two 5-year phases and is supported through an Adaptable Program Loan (APL). The project has five main components in the first phase. The first component pilots a capital cost recovery mechanism; promotes private irrigation investments on large-scale schemes; improves irrigation infrastructure management; and promotes cost reduction by strengthening local private sector/nongovernmental organizational capacity. The second component sets up an autonomously managed road authority to conduct routine maintenance on the main network and feeder roads; and elaborates a national rural transport strategy. The third component helps construct water supply and sanitation facilities and provides community education activities. It also provides training to construct on-site sanitation systems for households, schools, and health centers; and improves sanitation conditions and hygienic practices. The capacity-building sub-component supports local governments, private sector/NGO providers, and public sector agencies. The fourth component implements environmental action plans. The fifth component sets up the agency for rural works and equipment (AGETIER). |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Mali |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government, Education, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mali
- Support to the dialog and reconciliation process in Mali
- Dakar - Bamako Standard Gauge Railway (Senegal section)
- Bamako-Niamey Road Missing Links in Mali
- Mako - Dialocoto Road
- Mali - Development Programme for the Special Agro-Industrial Processing Zone of Koulikoro and Semi-Urban Bamako Regions (PDZSTA-BK)
- Mali - Project to Widen the Carrefour de la Paix - Woyowayanko Bridge - Point Y Urban Road Section in Bamako
- Mali - The Irrigation Development Program in Bani Basin and Selingue (PDI-BS)–Phase I
- Mali - Sevare-Gao Trans-Saharan Road Project
