logo
ProjectClosed

National Transmission Grid Project

One of 10,000+ projects Taiyo tracks in Turkey.

Source: World Bank Group

The objectives of the National Transmission Grid Project are: (a) the development of adequate transmission capability in a timely manner; (b) establishment of the independent operation of the transmission grid system; and (c) maintenance of the financial viability of the state institution responsible for grid development and operation. The project components include: (a) development of a three-ye

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about National Transmission Grid Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “National Transmission Grid Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the National Transmission Grid Project are: (a) the development of adequate transmission capability in a timely manner; (b) establishment of the independent operation of the transmission grid system; and (c) maintenance of the financial viability of the state institution responsible for grid development and operation. The project components include: (a) development of a three-year time-slice of Turkish Electricity Generation and Transmission Corporation's (TEAS) grid investments (transmission lines, substations and load dispatch facilities) for the period 1999 through 2002; and (b) technical assistance for: (i) establishment of the independent operation of the transmission grid system; (ii) institutional development including environmental analysis of grid investments; and (iii) helping TEAS borrow from the international markets.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project