National Tsunami Early Warning System Project
Closed · Antofagasta
Source: InfraPPPWorld
The project involves the design, construction, and operation of a National Tsunami Early Warning System in Chile.It includes:Installation of 1,029 alarm sirensalong the entire Chilean coast (1,003 new units and modernization of 26 existing ones).Infrastructure features: 11-meter steel poles with solar panels and battery backups to ensure operability during power outages.Regional and national contr
- Status
- Closed
- Sector
- Solar, Telecommunications, Power Generation (CCGT), Energy Storage, Steel, Government, Metal
- Location
- Antofagasta, Chile
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about National Tsunami Early Warning System Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the design, construction, and operation of a National Tsunami Early Warning System in Chile.It includes:Installation of 1,029 alarm sirensalong the entire Chilean coast (1,003 new units and modernization of 26 existing ones).Infrastructure features: 11-meter steel poles with solar panels and battery backups to ensure operability during power outages.Regional and national control centers: One in each of Chile’s 16 regions, plus a central control hub in the Metropolitan Region (Santiago).Operational management: Alerts will be activated remotely bySENAPRED, with backup satellite-based systems for redundancy.Integration with other emergency systems: The siren network will complement existing emergency alert platforms like theSAE(Emergency Alert System) andABC System(supporting ambulances, firefighters, and police).Project terms: 20-year concession,UF 2,915,000investment, expected award inMarch 2026, and full operation by2031. |
Original sector | Social & Health |
Procurement method | |
Budget |
Location
Country | Chile |
State | Antofagasta |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Solar, Telecommunications, Power Generation (CCGT), Energy Storage, Steel, Government, Metal |
Article published date | 2025-08-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
