National Urban Water Supply Project
Sector: Water Supply and Storage • Location: Indonesia
Source: World Bank
The development objective of the National Urban Water Supply Program for Indonesia is to provide access to improved water sources for the population and strengthen the operational performance of water service providers in selected urban areas.It has three components. i) the physical investment windows of sectoral development platform, (ii) the technical assistance and capacity building windows of
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Forest Products and Packaging, Commercial, Government, Power Generation (CCGT)
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about National Urban Water Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the National Urban Water Supply Program for Indonesia is to provide access to improved water sources for the population and strengthen the operational performance of water service providers in selected urban areas.It has three components. i) the physical investment windows of sectoral development platform, (ii) the technical assistance and capacity building windows of the framework, and (iii) Central Government’s development, implementation and continuous improvement of the framework. A fourth component will assist the Government at central and local levels with project implementation and management support. 1) First component, investment support for urban water supply infrastructure development will support the Central Government in providing investment support to at least 40 local government (LGs)/Local Government’s owned water supply enterprise (Perusahaan Daerah Air Minum) PDAMs of varying performance or categories through the investment packages available under the framework. Bank financing will complement existing Central Government financing support for investment to be made accessible to LGs/PDAMs. 2) Second component, technical assistance and capacity building for local governments and PDAMs will support the capacity building of LGs, PDAMs and other stakeholders aimed, at performance improvement in a range of technical, financial, commercial, managerial, human resources. The capacity building will also aim to strengthen climate and disaster risks resilience of urban water supply operations.3) Third component, advisory and policy development support for central government will support the strengthening and improvement of policies and instruments that forms the National Urban Water Supply (NUWAS) framework, including supporting the Government agencies that have the mandates and responsibilities for them. As necessary, additional or complementary policies and instruments will be developed. This component will support the National Steering Committee of Housing, Settlements, Water and Sanitation to assess, improve and/or develop national level policies, implementation guidelines and other instruments for urban water management, regional water supply services, water governance and utility reform, private sector involvement, utility financing, poor inclusive services, citizen engagement, performance based financing, and performance based contracting in the urban water sector.4) Fourth component, project implementation and management support will provide project management support the central, provincial and Local Government levels. A Central Management Consultant (CMC) will support the POKJA PPAS, CPMU and CPIUs on (i) communication/dissemination, (ii) screening and assessment of LGs/PDAMs proposals, (iii) monitoring, verification and evaluation of project implementation, and (iv) overall project management. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Forest Products and Packaging, Commercial, Government, Power Generation (CCGT) |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
