logo
ProjectClosed

NAT'L ELECTRIFICATION

Sector: Power Generation (CCGT) • Location: Ghana

Source: World Bank Group

The project objectives are to enable the Volta River Authority/Electricity Corporation of Ghana (VRA/ECG) to provide electricity from the national power grid to small urban centers and rural areas through a systematic electrification program, and to assist in the strengthening and rationalization of the sector institutions, particularly the ECG. The project is comprised of three main components:

Status
Closed
Sector
Power Generation (CCGT), Commercial, Government
Location
Ghana
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about NAT'L ELECTRIFICATION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “NAT'L ELECTRIFICATION” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ghana. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project objectives are to enable the Volta River Authority/Electricity Corporation of Ghana (VRA/ECG) to provide electricity from the national power grid to small urban centers and rural areas through a systematic electrification program, and to assist in the strengthening and rationalization of the sector institutions, particularly the ECG. The project is comprised of three main components: (a) a portion of a time slice of the investment program defined under an IDA-financed National Electrification Planning Study, which will include connection to the national power grid of all of the district capitals that are not supplied from the grid; (b) re-inforcement of the ECG's existing distribution network by expanding substations, and building or replacing major links between substations; and (c) institutional strengthening of ECG through regrouping of all its commercial activities under one directorate and hiring an outside firm under a performance-based management contract to run this new directorate.

Original sector

Energy and Extractives

Budget

Location

Country

Ghana

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project