logo

Natoaganeg School

Sector: Commercial • Location: Canada

Source: Bird Construction

Project
Unknown

The new Natoaganeg School is a kindergarten to grade 8 school that can accommodate more than 125 students. Completed almost five months ahead of schedule, the design-build contract model allowed Bird to effectively integrate with the design team and owner to streamline construction activities. During the project, Bird was committed to building a school that not only functionally exceeded all requi

Project Information FAQ

Project Information

4 Q
The project “Natoaganeg School” is an infrastructure initiative in the Commercial sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new Natoaganeg School is a kindergarten to grade 8 school that can accommodate more than 125 students. Completed almost five months ahead of schedule, the design-build contract model allowed Bird to effectively integrate with the design team and owner to streamline construction activities. During the project, Bird was committed to building a school that not only functionally exceeded all requirements, but emphasized the local culture of the Eel Ground First Nation. The school features two wings of classrooms equal in length with an iconic central light drum room, topped with a seven metre diameter geodesic skylight. The design also included the unique arrangement of the brick cladding to mirror rammed earth, a method of early building in North America that used various layers of different coloured clay soils rammed into forms with primitive cement binding it all together. The team, in partnership with the Eel Ground First Nation, developed a mentorship program that offered local First Nation residents the opportunity to work with skilled tradesmen in a field of their choice during construction. Since the successful completion of the school, Bird hired the tradesmen for another project in the area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data