logo

Natrium Nuclear Plant Kemmerer Unit 1

Sector: Nuclear • Location: Kemmerer, Wyoming, United States

Source: CCE NEWS

Project
Under Construction

TerraPower has commenced construction on its flagship Natrium plant, Kemmerer Unit 1, in Kemmerer, Wyoming. It is the first utility-scale advanced nuclear power plant to begin construction in the United States. The plant features a 345-megawatt sodium-cooled fast reactor paired with an integrated molten salt-based energy storage system, allowing output to boost to 500 MW during peak demand. The pr

Status
Under Construction
Sector
Nuclear, Power Generation (CCGT), Power Transmission, Energy Storage
Location
Kemmerer, Wyoming, United States of America
Updated
22 Jul 2026
Source
CCE NEWS

ConstructChat

Ask ConstructChat about Natrium Nuclear Plant Kemmerer Unit 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Natrium Nuclear Plant Kemmerer Unit 1” is an infrastructure initiative in the Nuclear sector, located in Kemmerer, Wyoming, United States. Taiyo aggregates data on it from CCE NEWS.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TerraPower has commenced construction on its flagship Natrium plant, Kemmerer Unit 1, in Kemmerer, Wyoming. It is the first utility-scale advanced nuclear power plant to begin construction in the United States. The plant features a 345-megawatt sodium-cooled fast reactor paired with an integrated molten salt-based energy storage system, allowing output to boost to 500 MW during peak demand. The project is delivered by Bechtel as the engineering, procurement, and construction contractor. Construction started after the issuance of a construction permit by the U.S. Nuclear Regulatory Commission, with non-nuclear site work underway since June 2024. The plant is expected to be operational around 2030–2031.

Original sector

Energy

Location

Country

United States of America (USA)

State

Wyoming

City

Kemmerer

Source

Source

CCE NEWS

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT), Power Transmission, Energy Storage

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project